Basic design JUMBO Shipping Fairplayer accommodation unit, escape ways and structural frame FEA
Accommodation frame
Beam theory FEA on frame
JUMBO Shipping lifting frame, beams and spreaders, WLL 1800 ton
Lifting Beam 25 x 1.25 x 2.5m, Steel S690
Hand -and FEA calculation, classification design
Lifting 1200 ton at port of Nouadhibou, Mauretania
Van Oord Stornes dummy splitter, mounted on ROV of fallpipe vessel
Hardox steel inside
Used on depth`s till 2000m, controlled dumping of rocks
Atlantic Dawn, basic design on "orange" stability pontoon including connector arm + hull integration (FEA), HVAC system, mooring systems, antenna deck
CFD concept study for TESO Texelstroom, HVAC strategy keeping CO levels on cardecks within the norm during transfer
Mock-up lifting platform for high emersion automotive simulator, full design including FEA
strength/stiffness + hydraulics and pneumatics
Automotive simulator including mock-up lifting platform
(Mock-up meaning automotive build simulator BIW)
Mock-up in action at BMW high emersion simulator centre